Hello All,
We have BPC NW 10.1 on BW 7.4 with non HANA DB at Location A and BW 7.4 with HANA DB at Location B.
We wanted to transport the BPC environment from Location A to Location B server and had below queries.
1. What is the purpose of ENABLE_ACCELERATOR/ACCELERATOR_ON parameters? Is it fair to assume the BPC models will be HANA optimized only when these parameters are turned on?
2. What is the purpose of BPC_MIGRATE_TO_HANA?
3. What is most preferred approach and why between the two options below to move the Environment from Location A to Location B:
a. Using UJBR utility
b. BW Transport mechanism